North America 60 Hz Conversion Support
NYTS supports selected 50 Hz to 60 Hz gas turbine conversion opportunities for North American projects. This service is designed for clients evaluating international turbine assets that may be technically suitable for operation in 60 Hz markets, subject to engineering review and compliance requirements.
50 Hz
International Asset
60 Hz
U.S.-Compliant Operation
Not every turbine is suitable for conversion. NYTS does not present conversion as a generic solution. Each opportunity must be reviewed based on turbine model, generator configuration, gearbox requirements, controls, electrical systems, balance-of-plant interfaces, OEM considerations, code requirements and project economics.

Conversion Support May Include
- Technical feasibility study
- Generator replacement or modification evaluation
- Gearbox assessment
- Control system evaluation
- Electrical engineering review
- Balance-of-plant integration
- U.S. code and standards review
- OEM or third-party engineering coordination
- Cost and schedule assessment
- Commissioning planning
Expanding the universe of viable equipment
50 Hz and 60 Hz equipment expertise allows NYTS to evaluate a wider range of technical solutions for clients. For North American projects, 60 Hz compatibility is essential. Where technically feasible, conversion can expand the universe of potential equipment options while maintaining a disciplined engineering and compliance review process.
Ready to explore a conversion opportunity?
Clients interested in conversion opportunities should complete the Project Questionnaire and identify the required operating frequency, project location, turbine model under consideration and delivery timeline.
